Ban-etsu West Line
磐越西線
Ban-etsu East Line connects Koriyama and Niitsu. The railway line is electrified between Koriyama and Kitakata.
Koriyamatomita station was opened between Koriyama and Kikuta. This diagram shows the track layout before the opening.
新津運輸区の車両検修部門は2023年3月に新潟車両センター新津派出に改組されました。
If you notice incorrect information on our site, please let us know via correction form.
Share this page!
新着情報
Popular Pages [May 2025]
- Tokaido Line (Tokyo - Atami)1
- Tohoku Line (Tokyo - Kuroiso)2
- Tokaido Line (Maibara - Kobe)3
- Ou Line (Fukushima - Akita)4
- Nambu Line5
- Tohoku Shinkansen6
- Chuo Line (Tokyo - Shiojiri)7
- 【延伸】有楽町線と東武2路線が直通すると「ちょっと困ったこと」が起こる納得の理由8
- Tsurumi Line9
- Tobu Railway Isesaki Line10
- Joban Line (Ueno - Iwaki)11
- Seibu Railway Ikebukuro Line12
- Odakyu Electric Railway Odawara Line13
- Tokaido Shinkansen14
- Yamanote Line15
- Sobu Line16
- Tokyo Metro Yurakucho Line17
- Hanwa Line18
- Keisei Main Line19
- Nagoya Railroad Nagoya Line20
Date of Surveillance
Section | Date of Surveillance |
---|---|
All | As of August 2013 |
List of Versions
Version | Date Published | ||
---|---|---|---|
1.0 | HTML |
HaisenNet Official Books

- Published
- Revised
- (Corrected track layout of Shinseki station.)